"implementation_approval_note":"Group 8 authorized and in progress; groups 1\u20137 verified. Capability admission and rollout remain NO-GO until the declared evidence passes.",
"approval_note":"2026-09-12: user requested amendments and help moving the design forward for a scalable pre-push security safety net, broader than WordPress; clarified that advisory output must be actionable and not SAST noise. Requirements and a proposed design were drafted together under that explicit request. No requirements, design, tasks, enforcement policy, or latency target are marked approved. Phase remains requirements-generated until human review. Existing predecessor approvals are unchanged. ; 2026-09-12: after the amended requirements/design and cross-language evaluation were presented, the maintainer said \"ok, next kiro phase\". Requirements and design are now approved for task generation; tasks remain unapproved. Earlier unapproved statements above describe the historical drafting state.",
"cross_language_note":"2026-09-12: maintainer endorsed the direction and clarified PMPro as core development case, JavaScript/Express Node APIs as required transfer workload, and C/C++ as additional shared-machinery/abstraction-limit evidence. Preserve language-agnostic core decisions; framework facts may differ. Detailed amended requirements/design remain pending review.",
"approval_history":[
{
"at":"2026-09-12T15:56:00Z",
"source":"ok, next kiro phase",
"action":"Accepted the presented amended requirements and design for task generation; task approval and implementation remain pending."
},
{
"at":"2026-09-12T16:20:40.814596Z",
"source":"approve.",
"action":"Accepted the generated task plan and authorized starting group 1 (1.1\u20131.4). Implementation started; tasks require independent review and fresh verification before completion."
"action":"Authorized continuing group 3 (3.1\u20133.4) after the group 3 next-step summary. Independent task review and fresh verification remain required."
"action":"Authorized all of group 4 (4.1\u20134.3), sequential implementation, independent task review and fresh verification. Groups 5\u20138 remain pending."
"action":"Authorized group 5 after the group 4 completion summary: explicit transaction replay, then the first PMPro/frozen-core Node experiment. Review and fresh evidence remain required."
"source":"continue with group 6 as a whole. do we need to amend the spec to get a go for the rollout",
"action":"Authorized group 6 (6.1\u20136.4). Clarified complete preparation/discovery reuse after measured group 5 bottleneck; rollout gates remain unchanged. Manual Kiro review fallback remains necessary after a fresh agent dispatch hit the thread limit."
"action":"Authorized tasks 8.1\u20138.4 and their qualification work; preserve joint gates and record NO-GO wherever prerequisites or measurements do not pass. Fresh dispatch hit thread limit; manual Kiro fallback."