Accepted direction: 2026-09-14. The maintainer agreed to the five-step path and asked
for it to be recorded in the roadmap as a spec. This amendment defines the order and
observable exit criteria for the remaining release work within pre-push-safety-net.
It preserves the approved requirements, completed tasks and existing owner boundaries.
It does not approve an unreviewed implementation design or enable any capability.
## Current position
**Next milestone: M3, with M4 population preparation running in parallel. M1a and M1b are met;
M2 is measured NO-GO; none of M1–M5 is verified.** The published `v1.2.0-alpha.1` is an
experimental implementation release, not a qualified advisory rollout. See
[current status](status.md) for measured evidence and limitations.
The immediate goal was one real changed-code defect with a defensible explanation and a quiet
fixed twin. That is met. Task 8.3 remains blocked.
## Strategy amendment, 2026-09-21
Accepted after the family detection census and the PHP correction. Four decisions, in the order
they should be executed. They change sequence and declared scope; they change no acceptance
threshold and no owner boundary.
1. **Close M3 at a scale that completes, before anything else.** PHP transfer is recorded as not
established, and that record came from two instrument defects rather than from the analyser:
a census verdict that checked question completion before findings, and a region budget whose
question count cannot fit any ceiling. Bounded to 25 and 100 regions, Paid Memberships Pro
completes with no timeout and establishes a true-positive SQL injection of the class its own
fact table predicted. Re-run the declared transfer replay at a completing scale and let the
result stand either way.
2. **Reserve and review the untouched M4 population now, in parallel.** M4 already permits
population preparation to proceed before the frozen candidate exists, and it is the longest
lead-time item on this path: nothing can be qualified without it however good the analyser
gets. Starting it after M2 serialises the release for no reason.
3. **M2 is the only engineering item that remains, and it cannot be scoped away.** A changed-code
transaction spends its whole budget in the build with zero query time. Graph reuse across
revisions is the accepted direction. Narrowing what a push analyses is explicitly not a way to
meet the latency gate, so the work is architectural and should have the effort that family
vocabulary work has been absorbing.
4. **Declare the v1 advisory scope as the families whose claims can be ADMITTED.** Admission
requires the entailed rung. Injection, untrusted destination and configuration entail with
witnesses; access control does not, because on any application that splits its route from its
data access the obligation is carried and a carried obligation corroborates by design. Shipping
it would ship silence. Output encoding, path, prototype and deserialization have not earned a
place either. M4 explicitly does not require every language or family to become eligible.
**Amendment to the amendment, same day.** Decision 1's re-run exposed something larger than the
runtime limit it was chasing. A repository holding two languages can never complete a question,
because a partition boundary is classified as a graph-integrity gap and such a gap demotes every
completed outcome; and a completed outcome is what admission requires. NodeGoat completes 299 of
299 and VAmPI 35 of 35 because each holds one language, while PMPro completes none of 520 and
still establishes 43 findings. The declared v0.1 target is WordPress plugins, and a plugin is PHP
plus its admin JavaScript, so on the target this tool was built for it can detect and never admit.
Task 13.4 carries it, and it now ranks with M2 rather than behind it: a narrow JavaScript-only
release can proceed without it, and the WordPress target cannot proceed at all.
**The risk this amendment does not remove.** Every number so far comes from two repositories used
to build the analyser, and one week of examining them surfaced seven false positives. On untouched
code the precision estimate will move, against a bar of 95% with zero false alerts on the fixed and
benign sides. Expect the first M4 evaluation to fail and budget for a second. That is the strongest
argument for decision 2.
## M1 — One real security change works end to end
Status: **NEXT — not verified**. Dependencies: existing immutable replay and scan machinery.
M1 is split into M1a (diagnose with vetoes recorded, not applied) and M1b (repair only
the vetoes M1a showed to matter). M1 is verified only when M1b passes.
Why the split: the detector already reports the NodeGoat contribution injection. The
2026-09-14 post-census bundle carries the raw `<lambda>2` witness at contributions.js
lines 32–34, and the same bundle carries thousands of `context_incomplete`,
`graph_incomplete`, `vendor_semantics_unresolved` and `ambiguous_line_correspondence`
reasons that discard it before any developer sees it. Four independent admission vetoes
are known: no context producer for dominance/config families, vendor exclusion acting as
a global completion veto, line ambiguity inherited by every question, and query identity
differing from witness identity. Requiring all four repaired before the first visible
result is a full production pass, not one detection.
### M1a — Show the detection with every veto recorded
Status: **MET 2026-09-16**, inside its one-week box. Evidence:
[M1a record](m1a-recorded-vetoes.md) and
[measurement](../../../benchmarks/measurements/2026-09-16-nodegoat-m1a-recorded-vetoes.json).
Raw witnesses present at contributions.js lines 32–34; fixed twin analyzed and quiet with
zero rows and no deadline reason; unchanged revision analyzed and recorded `unchanged`. The
kill criterion did not trigger. Five vetoes fired and were recorded, and M1a corrected the
diagnosis: with all five lifted the detection stops at `operation_correspondence_unresolved`,
a fifth veto that was not previously named. No defect was admitted and no capability enabled.
- Use the pinned NodeGoat contribution injection case, its fixed twin and an unchanged
vulnerable revision as development data. Record exact base/head revisions, expected
operation and outcome before running. Exercise the shipped replay path, existing ranker
and physically vendor-free graph; do not substitute a hand-selected slice or hard-coded
target function.
- Run all three revisions under an explicit experimental evaluation flag that **records**
each admission and comparison veto per finding instead of applying it. The flag is
task-local, off by default, cannot enable any hook capability, and every output it
produces is labeled experimental. A longer, explicitly named development budget applies;
it cannot satisfy the hook's latency gate.
- Deliverable: the raw finding on the vulnerable revision with location and witness, the
fixed twin genuinely analyzed and quiet, the unchanged revision not reported as a new
regression, and for every finding the exact list of vetoes that fired and why. Silence
from failure is not a pass; a fixed twin that timed out or was not analyzed fails M1a.
**Exit evidence:** a replayable three-revision record under the experimental flag with
exact revision, question and operation provenance, the per-finding veto list, and readable
source and census receipts. **Kill criterion:** if the fixed twin is not quiet under the
recorded-veto run, M1 has a detector problem, and M1b does not start until that is
diagnosed and recorded.
### M1b — Repair only the vetoes M1a showed to matter
Status: **NEXT — not verified**. M1a supplied the veto list: per-family change context,
question-owned vendor relevance, operation correspondence for an operation on a changed line,
file-wide correspondence ambiguity scope, and query-to-operation provenance. The owner
diagnosis expected the first and the last two; operation correspondence is the addition M1a
measured and is the blocker that survives every other repair.
- From the M1a veto list, repair only the context/family/identity contracts this case
actually needs. The owner diagnosis expects query-to-operation provenance and question-
owned vendor relevance to be the two that fire here; M1a confirms or corrects that.
Vetoes that did not fire on this case stay as they are and their families stay
experimental. Resolve vendor and correspondence boundaries through evidence of dependency
and ownership; unknown relevance remains unresolved.
- Rerun the three revisions **without** the recorded-veto flag through the production
evidence and comparison rules. Demonstrate a developer-readable evaluation finding with a
supported security consequence, exact location, witness, change attribution and concrete
repair direction. Verify the fixed twin is analyzed and produces no actionable defect, and
the unchanged vulnerable revision is not reported as a new regression.
- Keep qualification eligibility disabled. The demonstration uses explicit experimental
evaluation output; it cannot advertise an unqualified normal hook alert.
**Exit evidence:** a replayable vulnerable/fixed/unchanged comparison record through the
production rules, exact question and operation provenance, completed required checks,
reviewed explanation, readable source and census receipts, task-local regression
verification, and a list of which vetoes were repaired and which remain. Raw findings, rank
positions, synthetic-only controls and screenshots alone do not satisfy M1b.
Owners: contributor-scan for query/operation/context evidence; pre-push-safety-net for
comparison, admission, the recorded-veto flag and reporting. Requirements: 1.1–1.4,
2.1–2.4, 3.1–3.5, 6.3, 7.1–7.3.
## M2 — The same useful analysis fits the push budget
Status: **MEASURED AND UNMET, 2026-09-17.** Two attacks on engine startup were measured and
neither reaches the gate. A transaction-owned session is implemented and proven equivalent for
every shipped query kind, and it amortizes startup only across a long transaction: 326 s to 243 s
under a development budget, while under the 30-second deadline its own 9 to 13 second startup
means it usually declines to start. Removing JavaScript's redundant second engine start is a real
11.0 s against 21.0 s on identical graphs, but the attempt was reverted for an asymmetric census
gate that made 12 profile transactions pay two engine starts.
The profile names the actual cost: a changed-code transaction reaches its deadline inside the
build, head build 25.2 s of 30 s with query time 0.0 s. It is building a fresh whole-repository
graph for every pushed revision.
**Direction accepted 2026-09-17: do not rebuild a whole graph per push. Reuse the graph across
revisions instead of further optimising the rebuild.** The 30-second and 2-second gates are
unchanged; this milestone is not met, and the work is not scheduled here.
- Use the successful M1 case as a correctness baseline for a transaction-owned Joern
session within the existing backend. The measured census probe supports investigating
this design; it does not establish full-query equivalence or production readiness.
- Verify equivalent taint, dominance and configuration answers under matching semantics,
fresh request receipts, isolated graph identities, cache invalidation, crash handling
and process-group cancellation. Keep one deadline across the complete transaction.
- Rerun the frozen seven-class runtime profile with changed-code cases, cold starts,
dependency/configuration edits, growth and multi-ref transactions. Retain all timeouts
and unresolved checks. Identical-tip reuse cannot substitute for warm changed-code work.
**Exit evidence:** the M1 outcome remains correct; representative warm changed-code p95
is at most 30 seconds, cancellation/reporting at most two seconds, and supported-check
completion at least 95%, under the predeclared profile. A fast census alone does not pass.
Owner: contributor-scan runtime, with pre-push-safety-net deadline/cache integration.
Requirements: 4.1–4.4, 6.2–6.5, 7.3.
## M3 — The shared design transfers across languages
Status: **PARTIAL, 2026-09-17. Not met.** Python is established and PHP is blocked by runtime.
Python: all three declared VAmPI targets detected at their declared lines with their questions
answered, 35 of 35 questions complete on every case, nothing reported new on identical revisions,
zero admitted defects. That includes the SQL injection this spec names as previously unresolved,
and both broken-object-level-authorization targets, which is the first time access control has
answered on Python at all.
PHP: not established, and the blocker is now named. All PMPro comparisons exhausted every budget
tried, up to a 4500-second deadline with a 900-second query ceiling, and produced no artifact, so
there is no target evidence. Splitting a failed batch into parts did not rescue it.
A probe narrowed the cause: the evidence pass answers all 4,425 PMPro regions in one batch in
29.7 seconds with a 681 KB response, and its cost is fixed rather than per request. Neither
request count nor response size is anywhere near a limit. What fails is the execution pass, which
runs `reachableByFlows` per candidate. The pins, receipts and declared target are correct, so the
question is being asked properly and the dataflow work is what cannot finish.
The exit asks for Node, PHP and Python together. Two of three are in hand.
- Repeat the useful vulnerable/fixed comparisons with PMPro/PHP and VAmPI/Python,
including the previously unresolved VAmPI SQLI query/path evidence. Preserve explicit
limits for authorization and other families whose evidence is still unsupported.
- Keep framework knowledge in frontends/adapters and versioned facts. Equivalent normalized
evidence must retain the same core ranking, scope and admission behavior.
- Record core and adapter changes separately. Any PMPro-driven core change must be frozen
and replayed on Node/Express before claiming transfer; the initial Node-first repair
does not remove that existing requirement.
**Exit evidence:** reviewed development/regression results for Node, PHP and Python,
including positive, fixed and unchanged controls, exact provenance, coverage and runtime.
Do not label these repeatedly inspected projects independent qualification. C/C++ bounds
remain a separate unsupported abstraction; adding a new engine is not a prerequisite here.
Owners: contributor-scan shared evidence and framework adapters; pre-push-safety-net evaluation.
Requirements: 6.2–6.4, 8.1–8.4.
## M4 — Independent examples establish useful detection and low noise
Status: **PENDING M3**. Population preparation may proceed earlier, but evaluation follows
the frozen candidate. Reserve untouched cases before examining their scan results.
- Freeze reviewed vulnerable, fixed and benign changes from projects not used to develop
or tune the particular language/framework/family. Ghost remains reserved until its
actual reviewed population exists. Node evidence cannot qualify PHP or Python.
- Measure actual actionable alerts, supported recall, fixed-side silence, benign interruptions,
completed coverage and runtime together, with counts and uncertainty. Keep unlocated
targets, unanswered queries and unsupported cases visible in their declared populations.
- Apply the existing acceptance profile: at least 95% observed actionable precision,
at least 90% supported recall, at least 95% supported-check completion, the 30s/2s runtime
gates, nonzero reviewed emitted alerts and positive controls, and zero known fixed/benign
false alerts. Silence on everything fails. A core retune requires new untouched evaluation.
**Exit evidence:** reproducible, reviewed per-capability qualification with every mandatory
gate passing together. Report failures honestly and leave those capabilities experimental;
do not require every possible language or family to become eligible for a narrow release.
Owner: pre-push-safety-net task 8.3, consuming verified contributor-scan semantics.
Requirements: 6.1–6.5, 8.1–8.4 and the accepted experimental acceptance profile.
## M5 — Enable a narrow advisory rollout
Status: **PENDING M4**.
- Generate eligibility bound to the exact passing runtime, query, fact, ranking and policy
identities. Enable only independently qualified capabilities; stale or missing evidence
enables none. Advisory retains the same evidence bar as blocking.
- Revalidate the packaged vulnerable/fixed/benign push experience, compact reporting,
truthful incomplete coverage, local no-model operation and preservation/removal of hooks.
- Publish the supported scope, limitations and evidence with the advisory release.
Expand capabilities only when they earn qualification. Blocking deployment is a later,
explicit decision, even though opt-in blocking plumbing already exists.
**Exit evidence:** passing packaged acceptance validation and exact eligibility for the
declared advisory scope, with the release decision recorded. Only then mark task 8.3
and release readiness complete if their mandatory criteria are satisfied.
Owner: pre-push-safety-net admission, packaging and release validation.
Requirements: 3.1–3.5, 5.1–5.5, 6.5, 7.1–7.4.
## Execution and reporting contract
Use M1a → M1b → M2 → M3 → M4 → M5 as the critical path. Preparation may overlap, but later
milestones cannot substitute for missing earlier evidence. Necessary runtime repairs
that make M1 executable are allowed; a standalone speed benchmark cannot close M1.
Keep ranker-owned scope, vendor exclusion, language-agnostic core behavior and all
acceptance thresholds unchanged. No new source IR, second detector, differential graph
mutation, learned ranker or unrelated backlog is introduced by this amendment.
Before production edits, make the required owner design/task amendment concrete and
apply the existing Kiro approval, review and verification workflow. Prior authorizations
remain valid within their scope; this milestone record does not reset them.
Progress updates shall lead with the current milestone, observed developer outcome,
remaining blocker and next concrete action. Report implementation task counts separately.
Change a milestone to verified only with linked evidence; do not infer progress from
elapsed effort or a completed experimental release tag.
Immediate next action (M3, task 13.3): re-run the declared PHP transfer replay bounded to a
region budget whose questions complete, using the corrected census verdict, and record the
outcome either way. Then task 13.4, PHP question completion, because admission reads outcomes
and M4 measures completion at 95%. Task 15.1 (M4 population reservation) runs in parallel and
blocks on nothing. Do not begin another family vocabulary campaign: the census has said which
families can speak, and the constraint has moved to runtime and to evidence from code this