"approval_note":"2026-10-14 maintainer directive in session: spec the prover and queue implementation with Codex (fast-track; the three gates were passed on that instruction, review the documents before the second delivery). 2026-10-29: requirements amended after the 2026-10-28 gates 1-5 measurements (trace resolution, programmatic entry facts, failure visibility); requirements await re-approval, then design and tasks must be revisited against the amendment before implementation resumes."