spec(pre-push-safety-net): record M1–M5 release milestones and split M1 into M1a/M1b
Add release-milestones.md as the executable outcome contract: prove one useful Node detection, make it fast, verify PHP/Python transfer, qualify on untouched cases, then enable a narrow advisory rollout. Link it from the roadmap, safety-net steering, requirements, tasks, status and spec.json. Split M1 after review. The raw NodeGoat <lambda>2 witness already exists in the 2026-09-14 post-census bundle; four admission vetoes discard it. M1a runs the vulnerable/fixed/unchanged revisions under a task-local experimental flag that records each veto instead of applying it, with a one-week box and a kill criterion if the fixed twin is not quiet. M1b repairs only the vetoes that fired and reruns through production rules. Existing approvals and thresholds unchanged. Co-Authored-By: Claude Fable 5.1 <[email protected]> Claude-Session: https://claude.ai/code/session_01EmM1j46qgKMh3zqD1QMwEo
This commit is contained in:
co-authored by
Claude Fable 5.1
parent
1ad472c68d
commit
8b66d5cb75
@@ -1,12 +1,14 @@
|
||||
# Implementation Plan: pre-push-safety-net
|
||||
|
||||
Status: task plan approved by the maintainer on 2026-09-12. Groups 1–6 (tasks 1.1–6.4)
|
||||
are implemented, reviewed and verified (20/27 subtasks). Tasks 4.3 and groups 5–6 used the
|
||||
explicit Kiro manual review fallback after fresh agent dispatch reached its thread limit.
|
||||
Group 5's six cold PMPro/Node timeouts remain historical NO-GO evidence. Group 6 verifies
|
||||
compatible reuse with equal evidence/admission in a packaged authored JavaScript control;
|
||||
its identical-revision run completed in 2.00s. This is not representative warm p95 or
|
||||
independent capability qualification. Groups 7–8 remain pending; rollout remains NO-GO.
|
||||
Status: the existing task plan remains approved. Groups 1–7 and tasks 8.1, 8.2 and 8.4
|
||||
are verified (26/27 executable subtasks); task 8.3 and rollout remain NO-GO. Later work
|
||||
used the documented manual review fallback where agent dispatch reached its limit.
|
||||
|
||||
The accepted [release milestone spec](release-milestones.md) now orders remaining work:
|
||||
M1 useful Node comparison → M2 speed → M3 shared-language transfer → M4 independent
|
||||
qualification → M5 narrow advisory rollout. All five milestones remain unverified.
|
||||
These are release outcomes, not additional checked implementation tasks. Prepare bounded
|
||||
owner design/task amendments as needed; preserve all completed task evidence below.
|
||||
|
||||
## Execution contract
|
||||
|
||||
|
||||