fix(pre-push-safety-net): stop semantic planning at the shared deadline

This commit is contained in:
Marius Ciepluch
2026-09-13 15:11:42 +02:00
parent 31e5ec7430
commit 8fe3a7e51e
8 changed files with 24687 additions and 11 deletions
+1
View File
@@ -149,6 +149,7 @@ Task 5.1 is also verified (15/27 total); task 5.2 and groups 6–8 remain pendin
- _Depends: 1.3, 3.1, 3.4, 4.3_
- _Requirements: 1.1, 2.1, 3.1, 3.4, 4.1, 4.2, 5.5, 7.1, 7.3_
- [ ] 5.2 Measure PMPro and frozen-core Node transfer
- _Prerequisite repaired 2026-09-13:_ 3.1/5.1 deadline regression verified in the packaged Node replay; re-freeze the experiment after this core identity change.
- Replay each prepared security/fixed/benign case, first using the declared hook deadline; record timeouts and stage costs. A separately named extended lab run may obtain witnesses but cannot satisfy the hook latency gate.
- Freeze the core after PMPro, run Node with existing facts, and classify instrument, mapping, fact, scope and domain gaps without tuning on an untouched holdout.
- Done when one joint artifact reports actual evidence and outcomes for both workloads, with unresolved cases retained and an explicit feasibility decision; no normal capability is enabled here.