# Group 7 implementation and verification The maintainer authorized all of group 7 on 2026-09-13. Fresh agent dispatch failed with `agent thread limit reached`; kiro-impl's explicit manual fallback applies. Reviews here are main-context reviews, not independent reviewer evidence. Rollout remains NO-GO and the default capability registry remains empty. ## Task 7.1 brief Requirements 1.1, 1.3, 1.4, 4.1, 5.1–5.5 and 7.1; design: Snapshot Adapter, Push runner, Result and Hook Adapter. Consume every Git update and remote identity, resolve exact comparisons using the existing adapter, share one absolute budget, retain independent finding/coverage/enforcement statuses and all comparison evidence. Verify real stdin delivery, immutable readable snapshots, deduplication, missing bases, deletions, no work, policy combinations and deadline ownership. ## Status Report - STATUS: READY_FOR_REVIEW - TASK: 7.1 - RED_PHASE_OUTPUT: `/tmp/group7-1-red.log`: four failures with the interface switch OFF. ON: 37 focused tests passed; switch removed, final focused run: 29 passed (including 11 transaction controls). - TESTS_RUN: full suite 1274 passed, 9 skipped in 109.09s; final targeted tests cover the subsequently added five policy combinations and retained resolved identity on preparation failure. Ruff and mypy pass. - CONCERNS: synthetic admission controls prove enforcement, not detector eligibility. No capability enabled. ## Review Verdict - VERDICT: APPROVED - TASK: 7.1 - MECHANICAL_RESULTS: actual diff reviewed; full suite and final targeted checks pass; no new placeholders or credentials; boundary restricted to CLI, push runner and report. - FINDINGS: fixed child stdin closure by duplicating Git's descriptor before forking; remote URL is hashed rather than storing possible credentials; unresolved comparison identity survives preparation failure. - RED phase: VERIFIED. - SUMMARY: One transaction retains every resolved ref and completed scan without resetting the analysis deadline. ## Verification Result - STATUS: VERIFIED - CLAIM_TYPE: TASK - CLAIM: Task 7.1 interface and policy integration implemented. - EVIDENCE: `/tmp/group7-1-full.log`, `/tmp/group7-1-final-focused.log`; ruff, mypy and diff checks exit 0. - GAPS: Representative multi-ref performance and real capability admission remain group 8 work.