{ "feature_name": "pre-push-safety-net", "created_at": "2026-09-12T15:35:00Z", "updated_at": "2026-09-13T15:45:15.902603+00:00", "language": "en", "phase": "implementation", "approvals": { "requirements": { "generated": true, "approved": true }, "design": { "generated": true, "approved": true }, "tasks": { "generated": true, "approved": true } }, "ready_for_implementation": true, "implementation_approval_note": "Group 7 authorized as a whole; 7.1 verified, 7.2\u20137.3 in progress. Default capability registry empty; rollout NO-GO.", "depends_on": [ "contributor-scan" ], "related_specs": [ "flow-aware-ranking", "zero-with-a-reason", "finding-feedback-loop" ], "approval_note": "2026-09-12: user requested amendments and help moving the design forward for a scalable pre-push security safety net, broader than WordPress; clarified that advisory output must be actionable and not SAST noise. Requirements and a proposed design were drafted together under that explicit request. No requirements, design, tasks, enforcement policy, or latency target are marked approved. Phase remains requirements-generated until human review. Existing predecessor approvals are unchanged. ; 2026-09-12: after the amended requirements/design and cross-language evaluation were presented, the maintainer said \"ok, next kiro phase\". Requirements and design are now approved for task generation; tasks remain unapproved. Earlier unapproved statements above describe the historical drafting state.", "cross_language_note": "2026-09-12: maintainer endorsed the direction and clarified PMPro as core development case, JavaScript/Express Node APIs as required transfer workload, and C/C++ as additional shared-machinery/abstraction-limit evidence. Preserve language-agnostic core decisions; framework facts may differ. Detailed amended requirements/design remain pending review.", "approval_history": [ { "at": "2026-09-12T15:56:00Z", "source": "ok, next kiro phase", "action": "Accepted the presented amended requirements and design for task generation; task approval and implementation remain pending." }, { "at": "2026-09-12T16:20:40.814596Z", "source": "approve.", "action": "Accepted the generated task plan and authorized starting group 1 (1.1\u20131.4). Implementation started; tasks require independent review and fresh verification before completion." }, { "at": "2026-09-12T18:32:19.033933Z", "source": "ok, next kiro phase, approved; correct. we can continue with the spec", "action": "Authorized group 2 (2.1\u20132.3), resumed after local Claude Mem repair. Independent review and fresh verification remain required." }, { "at": "2026-09-13T07:48:02.155687Z", "source": "continue with the task", "action": "Authorized continuing group 3 (3.1\u20133.4) after the group 3 next-step summary. Independent task review and fresh verification remain required." }, { "at": "2026-09-13T09:17:01.788332+00:00", "source": "approved", "action": "Approved contributor-scan frontend retention prerequisite; implement it and resume task 3.4 review and verification." }, { "at": "2026-09-13T10:26:47.307154+00:00", "source": "move on to group 4 as a whole", "action": "Authorized all of group 4 (4.1\u20134.3), sequential implementation, independent task review and fresh verification. Groups 5\u20138 remain pending." }, { "at": "2026-09-13T12:40:57.961577+00:00", "source": "approved", "action": "Authorized group 5 after the group 4 completion summary: explicit transaction replay, then the first PMPro/frozen-core Node experiment. Review and fresh evidence remain required." }, { "at": "2026-09-13T13:58:52.336506+00:00", "source": "continue with group 6 as a whole. do we need to amend the spec to get a go for the rollout", "action": "Authorized group 6 (6.1\u20136.4). Clarified complete preparation/discovery reuse after measured group 5 bottleneck; rollout gates remain unchanged. Manual Kiro review fallback remains necessary after a fresh agent dispatch hit the thread limit." }, { "at": "2026-09-13T15:45:15.902603+00:00", "source": "ok, continue with group 7 as a whole", "action": "Authorized tasks 7.1\u20137.3; manual Kiro fallback after fresh dispatch hit thread limit. Group 8 and rollout remain pending." } ], "task_review": { "verdict": "PASS", "independent": true, "repair_passes": 1, "major_groups": 8, "executable_subtasks": 27, "requirements_covered": 35, "record": "task-review.md" }, "implementation_progress": { "completed_tasks": [ "1.1", "1.2", "1.3", "1.4", "2.1", "2.2", "2.3", "3.1", "3.2", "3.3", "3.4", "4.1", "4.2", "4.3", "5.1", "5.2", "6.1", "6.2", "6.3", "6.4", "7.1" ], "remaining_tasks": 6, "verification_record": "implementation-group-7.md", "verification_records": [ "implementation-group-1.md", "implementation-group-2.md", "implementation-group-3.md", "implementation-group-4.md", "implementation-group-5.md", "implementation-group-6.md", "implementation-group-7.md" ], "next_group": 7, "blocked_tasks": [], "feasibility": "NO-GO for rollout: compatible identical-revision reuse verified; representative changed-code p95/completion and independent alert eligibility remain unmet." } }