mirror of
https://github.com/norandom/OpenUltraSAST.git
synced 2026-10-16 03:49:26 +00:00
spec(search-with-proof): separate trust domains (brain with key, executor with repo code)
Replaces the accepted key-exposure exception: the key never shares a sandbox with repository code; executor AX tasks exchange commands and results via presigned objects. Firecracker executors only if the pilot build-failure rate requires it. Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
co-authored by
Claude Opus 5.5
parent
5e03bdf07f
commit
721c4b0997
@@ -101,10 +101,12 @@ known instead of restarting.
|
||||
operator). Store credentials stay out of the cluster (presigned links, as today). For this arm, model calls inside
|
||||
the cluster supersede `unseen-repo-evaluation` Req 4.4 (model calls on the VM); that boundary is unchanged for all
|
||||
other arms. *(maintainer decision 2026-10-05: scoped key in the cluster)*
|
||||
2. The key never appears in a manifest, a log, a board entry or a record. *(Amended 2026-10-05, maintainer decision.)*
|
||||
In the cluster, repository code run by an explore step shares the task with the key and could read it; this risk is
|
||||
accepted and bounded: the key is scoped to search, has a low spend cap, and is rotated after every run. On the host
|
||||
and VM the inner sandbox keeps the key out of executed code.
|
||||
2. The key never appears in a manifest, a log, a board entry or a record, and never shares a sandbox with repository
|
||||
code. *(Amended 2026-10-05, maintainer decision: trust domains are separated instead of isolated inside one task.)*
|
||||
The agent loop (the "brain", holding the key) runs on the VM or in its own AX task and executes no repository code;
|
||||
every tool call that touches the repository runs in a separate executor AX task without the key, exchanging
|
||||
commands and results through presigned store objects. A Firecracker executor runtime is considered only if the
|
||||
pilot's `could_not_build` rate shows gVisor cannot build the projects.
|
||||
|
||||
### Requirement 6: Feasibility pilot, false-proof qualification, then the unseen pool
|
||||
|
||||
|
||||
Reference in New Issue
Block a user