Files
Open_Ultra_SAST/.kiro/specs/pre-push-safety-net/implementation-group-7.md
T

2.3 KiB
Raw Blame History

Group 7 implementation and verification

The maintainer authorized all of group 7 on 2026-09-13. Fresh agent dispatch failed with agent thread limit reached; kiro-impl's explicit manual fallback applies. Reviews here are main-context reviews, not independent reviewer evidence. Rollout remains NO-GO and the default capability registry remains empty.

Task 7.1 brief

Requirements 1.1, 1.3, 1.4, 4.1, 5.1–5.5 and 7.1; design: Snapshot Adapter, Push runner, Result and Hook Adapter. Consume every Git update and remote identity, resolve exact comparisons using the existing adapter, share one absolute budget, retain independent finding/coverage/enforcement statuses and all comparison evidence. Verify real stdin delivery, immutable readable snapshots, deduplication, missing bases, deletions, no work, policy combinations and deadline ownership.

Status Report

  • STATUS: READY_FOR_REVIEW
  • TASK: 7.1
  • RED_PHASE_OUTPUT: /tmp/group7-1-red.log: four failures with the interface switch OFF. ON: 37 focused tests passed; switch removed, final focused run: 29 passed (including 11 transaction controls).
  • TESTS_RUN: full suite 1274 passed, 9 skipped in 109.09s; final targeted tests cover the subsequently added five policy combinations and retained resolved identity on preparation failure. Ruff and mypy pass.
  • CONCERNS: synthetic admission controls prove enforcement, not detector eligibility. No capability enabled.

Review Verdict

  • VERDICT: APPROVED
  • TASK: 7.1
  • MECHANICAL_RESULTS: actual diff reviewed; full suite and final targeted checks pass; no new placeholders or credentials; boundary restricted to CLI, push runner and report.
  • FINDINGS: fixed child stdin closure by duplicating Git's descriptor before forking; remote URL is hashed rather than storing possible credentials; unresolved comparison identity survives preparation failure.
  • RED phase: VERIFIED.
  • SUMMARY: One transaction retains every resolved ref and completed scan without resetting the analysis deadline.

Verification Result

  • STATUS: VERIFIED
  • CLAIM_TYPE: TASK
  • CLAIM: Task 7.1 interface and policy integration implemented.
  • EVIDENCE: /tmp/group7-1-full.log, /tmp/group7-1-final-focused.log; ruff, mypy and diff checks exit 0.
  • GAPS: Representative multi-ref performance and real capability admission remain group 8 work.